Videos · 1:00 · 2026-09-26

Six things that go wrong in a plant, caught with their cause.

Six things that go wrong in a plant, caught with their cause 1:00 · sound on
The real Planner on a fictional sample plant (Orbit Cycles). In development: the deterministic core is built; the AI layer is designed, not built.

On the Nanti Manufacturing Planner’s Today cockpit: a shortage with the sales order that needs the units, a promise at risk, a purchase order still open weeks after its due date, a manufacturing order blocked by a short component, excess stock above its coverage limit, and a product set to manufacture with no bill of materials. Each exception carries its cause and a link to the record behind it.

Read the page: Nanti Manufacturing Planner

Transcript

  1. Six things that go wrong in a plant. Each one with its cause · Nanti Manufacturing Planner.
  2. Shortage: Short 68 units, and the order that needs them.
  3. Promise at risk: The date we promised, and when we can cover it.
  4. Late supply: A purchase order, weeks late.
  5. Blocked manufacturing order: Starts Friday. The spokes aren't there.
  6. Excess: 5,000 reflectors above their limit.
  7. Bad data: missing BoM: Set to manufacture, with no bill of materials.
  8. Exception types · Each with its cause. Supply: shortage · late supply · supply at risk. Promises: promise at risk. Production: blocked MO · late MO · overload. Stock: excess · dead stock. Data: missing BoM · missing vendor · missing lead time · stale reorder rule.
  9. Planning that looks ahead. The deterministic core is built and running on Odoo 19. The AI layer is designed, not built. nanti.ai/manufacturing-planner In development · sample plant Orbit Cycles, fictional data · design partners wanted.